Date: 13 July 2021 Witness: Contractual Documents - A Summary (Version 5) - 13 July 2021> View other evidenceType: Document> View more Document evidence
Downloads Download all files as a zip ART00008238_Part 5 - Contract Sum Analysis prepared by Artelia.pdf(1.94 MB) CCL00001595_Quote from RSK Environment Ltd to Curtins Consulting for structural investigations into Grenfell Tower.pdf(2.39 MB) ART00009148_28. Method of Demolition (REPLACEMENT) - Artelia_00018563.pdf(4.35 MB) CCL00003430_RE Grenfell Tower - intrusive investigation (42187085-1).MSG Email chain concerning quotation.pdf(781.55 KB) CCL00002151_Curtins Consulting, drawing entitled General Notes, LO1212-012 Rev T3.pdf(615.87 KB) CCL00002148_Curtins Consulting, drawing entitled Details, LO1212-009 Rev T3.pdf(645.89 KB) CCL00002146_Curtins Consulting, drawing entitled Existing & Proposed Typical Residential Level Plan, LO1212-006 Rev T5 corresponding to Studio E drawing 1279-RE115 Rev 01.pdf(286.73 KB) CCL00002145_Curtins Consulting, drawing entitled Existing & Proposed Office Level Plan, LO1212-005 Rev T5.pdf(477.54 KB) CCL00002076_Tender Query Log Issue 11.docx.pdf(8.33 MB) CCL00002072_Tender Query Log Issue 10.docx.pdf(7.51 MB) CCL00002142_Curtins Consulting, drawing entitled Existing & Proposed Ground Floor Plan, LO1212-002 Rev T5, corresponding to Studio E 1279-RE111..pdf(492.2 KB) CCL00001594_Email correspondence between Tom Ashton at Curtins Consulting and Kate Andrews at RSK re quote for structural investigations into Grenfell Tower.pdf(1.67 MB) CCL00000705_Curtins drawing entitled _Existing & Proposed Mezzanine Floor Plans_, LO1212-003 Rev T5.pdf(540.02 KB) CCL00000199_Studio E drawing entitled _Proposed Roof Plant Plan_, 1279 (04) 108.pdf(482.69 KB) CCL00000164_Studio E drawing entitled _Existing Sections_ 1279 (02) 041 Rev 00.pdf(593.33 KB) CAL00000028_E-mail KCTMO to Calford Seaden about inspection visit scheduling.pdf(90.09 KB) CAL00000007_E-mails between KCTMO and Calford Seaden arranging a full condition survey for the two lifts at GT.pdf(591.29 KB) ART00009150_113 - Oct 13 - Artelia - Grenfell Tower.pdf(360.97 KB) CCL00001427_Curtins fee breakdown - novated to contractor.pdf(4.96 KB) ART00009149_121 - Jan 14 - Artelia - Grenfell Tower - issued 18-07-14.pdf(343.18 KB) CEP000000990_Davies Sheetmetal ; Delivery Note.pdf(197.32 KB) CEP000000692_Email between James Clifton, Neil Wilson and Steve Blake discussing the quotation and specification of cladding.pdf(589.64 KB) CEP000000693_Purchase Order- Spandrel Panels & Columns.pdf(1.26 MB) CEP000001193_Gesipa Blind Riveting Systems purchase order in relation to pop rivets; order number ARC5213_A_012.pdf(164.61 KB) CEP000001003_Revised Purchase Order- Cladding Fixings.pdf(211.41 KB) CEP000001124_Purchase Order.pdf(243.32 KB) CEP000001168_Purchase Order HF.pdf(624.93 KB) CEP000000679_CEP TERMS AND CONDITIONS OF SALE.pdf(158.17 KB) CEP000000680_Curtain Wall - Order from Harley.pdf(421.45 KB) CEP000000472_Email correspondence from Harley to CEP confirming instructions for Metal Tech 5-20 Hi+ Tilt & Turn window system; includes discussion as to time frames, deliveries & aluminium ext.pdf(987.48 KB) CEP000000678_Spreadsheet of panels supplied and to be supplied (attached to CEP email with quotation for remaining panels 15 September 2015).pdf(587.35 KB) CEP000000529_Harley purchase order to CEP for supply & fabrication of Reynobond ACM panels.pdf(309.68 KB) CEP000000492_(1) Order form issued by Harley for the Metal Tech 5-20 Hi+ Tilt & Turn window system including addition cost of factory glazing - total quoted £567,501.90; (2) based on Harley dr.pdf(146.65 KB) CEP000000471_Email correspondence from CEP to Harley as to _extra over_ quote for Metal Tech 5-20 Hi+ Tilt & Turn window system; specifically in relation to factory glaze of the windows - quote.pdf(507.71 KB) CEP000000470_CEP quotation to Harley for Metal Tech 5-20 Hi+ Tilt & Turn window system (excluding glazing, trickle vents, fixings); total of £455,255.25.pdf(23.28 KB) CEP000000469_Email correspondence between CEP & Harley discussing Metal Tech 5-20 Hi+ Tilt & Turn window system quotation (excluding glazing, trickle vents, fixings) & delivery and completion t.pdf(890.56 KB) CEP000000447_Email correspondence from Harley to CEP as to quote for Metal Tech 5-20 Hi+ Tilt & Turn window system; attaching schedule of windows.pdf(483.95 KB) CCL00004300_Studio E NBS Specification report.pdf(113.15 MB) CEP000000677_Email from CEP to Rydon concerning and attaching a quotation for cassette panels.pdf(12.43 KB) CEP000001345_Purchase Order - Window Accessories from Metal Technology Ltd.pdf(273.48 KB) CEP000005833_Harley CW- Order Form- Window Restrictors.pdf(42.55 KB) CEP000005661_Metal Technology - Order Confirmation for corner slider and other items.pdf(14.58 KB) CEP000003177_Delivery Note-AL Angle.pdf(1.42 MB) CEP000003158_Blackburns Metal Delivery Note- Al Angle.pdf(1.39 MB) CEP000001292_Purchase Order - Fixing Assembly from Schueco UK Ltd.pdf(183.92 KB) CEP000001342_Purchase Order- Rivets.pdf(156.45 KB) CEP000001338_Purchase Order-Rivets.pdf(184.28 KB) CEP000001308_Purchase Order - Expansion Sleeve and Water Deflector from Metal Technology Ltd.pdf(173.43 KB) CEP000001293_Schuco_ Order Confirmation - Fixing Assembly from Schuco Ltd.pdf(276.3 KB) CEP000001281_Purchase Order - Mill Insert_Cleat from Metal Technologies Limited.pdf(187.09 KB)