Date: 30 September 2020 > View this hearingWitness: John Hoban> View other evidenceType: Document> View more Document evidence
Downloads Download all files as a zip RBK00033934_2018.11.30 Witness Statement of John Edward Hoban (RBKC).pdf(5.23 MB) RBK00050416_2019.07.09 Witness statement of John Edward Hoban.pdf(8.23 MB) MET00065120_Unsigned draft witness statement of John Hoban (RBKC).pdf(669.14 KB) HOB00000219_Draft MPS witness statement of John Hoban with annotations (unsigned, undated).pdf(6.51 MB) IDX0155_John Hoban No.1 (RBKC Building Control).pdf(55.4 KB) IDX0156_John Hoban No. 2 (RBKC Building Control) (1).pdf(59.99 KB) RBK00033931_Exhibit JEH_5 - original drawing 1279 SEA (05) 101 00 Proposed North Elevation Rev01.pdf(526.17 KB) RBK00033932_Exhibit JEH_4 - email chain 03.03.15 - 20.03.15.pdf(723.7 KB) RBK00033933_Exhibit JEH_3 - email chain 03.03.15 – 11.03.15.pdf(1.27 MB) RBK00033936_Exhibit JEH_1 - email chain 03.03.15 – 11.03.15.pdf(1.39 MB) RBK00033937_Exhibit JEH_2 - email chain 02.09.14 - 05.09.14.pdf(829.3 KB) RBK00050414_Exhibit JEH7 - Training record.pdf(1.26 MB) RBK00050415_Exhibit JEH6 - Career history.pdf(1.25 MB) ART00003931_Artelia minutes relating to progress meeting number 10 on 21 April 2015 dated 24 April 2015.pdf(2.76 MB) CLG10006814_Department for Communities and Local Government - Building Control Performance Standards.pdf(5.97 MB) RBK00001221_LDSA General Meeting Minutes Oct 2015.pdf(490.69 KB) RBK00003810_Emails between Bruce Sounes, Neil Crawford (Studio E), John Allen, Paul Hanson, John Hoban (RBKC Building Control), Terry Ashton (Exova) and Duncan Campbell (Max Fordham) re GT ref.pdf(177 KB) RBK00003854_Emails between Bruce Sounes (Studio E), John Allen, Paul Hanson, John Hoban (RBKC Building Control), Terry Ashton (Exova) and Duncan Campbell (Max Fordham) re GT refurbishment fire.pdf(167.49 KB) RBK00033895_Exhibit PDH_6 - Submission _ (S1) 10_11_2014.pdf(1.94 MB) RBK00044900_John Hoban Oultook entry - Grenfell Tower.pdf(7.82 KB) RBK00048649_Emails between StudioE, MF, RBKC regarding the proposed fire strategy.pdf(164 KB) RBK00048682_Emails between Rydon, RBKC, and StudioE regarding division of duties between Paul Hanson and John Hoban.pdf(40.78 KB) RBK00048693_Emails between StudioE and RBKC regarding fire strategy plans and the Building Regulations 2010.pdf(50.69 KB) RBK00048696_14 10 06 John Hoban Performance Appraisal forms 2014 2015 mid year review.docx.pdf(148.6 KB) RBK00048753_John Hoban Performance Appraisal form 2016.pdf(125.92 KB) RBK00048852_160608 John Hoban Performance Appraisal 2016 2017.docx.pdf(119.05 KB) RBK00052486_Exhibit JW_3 - P6 _Building Regulation Applications_ document.pdf(162.01 KB) RBK00052487_Exhibit JW_4 - Standard Form 60 draft decision letter.pdf(31.44 KB) ART00004173_Artelia Grenfell Tower Progress Meeting No 11 Progress Update Minutes.pdf(2.98 MB) BSD00001422_Email chain between Harley, Studio E and Exova concerning when it necessary to use cavity barriers in relation to cladding and insulation.pdf(2.16 MB) CEL00000010_LABC Registered System certificate for Celotex RS5000.pdf(370.4 KB) CEL00000412_Celotex RS5000 Product Datasheet.pdf(1.16 MB) HAR00004698_Email between Harley attaching drawings of cladding rail design.pdf(401.72 KB) HAR00006598_Studio E, drawing entitled Detail Section Sheet 1, 1279 (06) 120 Rev 00.pdf(3.68 MB) INQ00014085_What's the difference between fire proof and fire resistant_ - LABC blog post dated 15_03_2017, retrieved from LABC website 30_09_2020.pdf(1.33 MB) JRP00000160_JRP Site Inspection Report- Grenfell Tower No11.pdf(2.04 MB) JRP00000168_JRP Site Inspection Report 3 - Grenfell Tower.pdf(1.56 MB) JRP00000169_JRP Site Inspection Report- Grenfell Tower.pdf(1.93 MB) MAX00004666_Email from KCTMO to MF RE_ meeting with Building Control, Rydon, J S Wright, Studio E and PSB re_ AOV.pdf(1.54 MB) RBK00002993_FW_ Grenfell Towers 30_06_2016.pdf(22.34 KB) RBK00003023_Building Control Completion Walk Around.pdf(11.89 KB) RBK00010780_Email correspondence between RBKC and Rydon, detailing high level updates on the standard at which work is being completed at Grenfell Tower, following the Building Control Site in.pdf(24.15 KB) RBK00010782_Correspondence sent to John Hoban, containing a brief update on the cladding works being undertaken at Grenfell Tower following a site visit..pdf(10.91 KB) RBK00013224_Document entitled 'The Building Regulations 2010 (as Amended)', detailing areas requiring attention following a site visit..pdf(44.95 KB) RBK00018811_RBKC Position Statement Supporting Document - Document 17.pdf(394.75 KB) RBK00044888_John Hoban Outlook entry for Grenfell Tower site direct.pdf(172.12 KB) RBK00048732_Emails between Harley, Rydon. StudioE, and RBKC regarding cladding insulation and building height.pdf(112.38 KB) RBK00050786_Application from John Hoban to Join the Association of Building Engineers (ABE) including details of training and qualifications.pdf(913.32 KB) RBK00052479_Exhibit JA_4 - Grenfell tower_0.pdf(420.85 KB) RBK00059350_Email from Paul Hanson to John Allen subject _BSI Fire Guide re terminology_.pdf(20.4 KB) RBK00059351_BSI Dont be a flaming Liability A4.pdf(1.66 MB) RYD00041667_Rydon, Grenfell Tower, Progress Report No. 11.pdf(3.35 MB) RYD00091475_Internal Rydon email, regarding building control findings from visit to Grenfell Tower..pdf(575.48 KB) SEA00000225_Studio E drawing entitled Proposed West Elevation, 1279 PL 322, Issue 01. Rev 01..pdf(2 MB) SEA00013045_1279 SEA (06) 110 - Typical Bay.pdf(577.5 KB) TMO10017227_2106-01-08 Meeting Mintues with Building Control.doc.pdf(1.42 MB) MET00071032_Exhibit JEH_01 to the witness statement of John Hoban.pdf(262.48 KB) MET00071033_Exhibit JEH_02 to the witness statement of John Hoban.pdf(1.79 MB)