Date: 29 September 2020 > View this hearingWitness: Mark Dixon> View other evidenceType: Document> View more Document evidence
Downloads Download all files as a zip SDP00000196_Witness statement of Mark Reginald Dixon (S D Plastering).pdf(200.23 KB) MET00056695_MET Witness Statement of Mark Reginald Frank Dixon (SD Plastering Ltd) re construction work carried out by SD Plastering on Grenfell Tower including dry lining, plastering and ceil.pdf(4.46 MB) IDX0163_Mark Dixon (S D Plastering).pdf(57.42 KB) SDP00000189_Exhibit MRD_9 - Revised Quotation.pdf(345.28 KB) SDP00000190_Exhibit MRD_6 - Email exchange between Daniel Osgood and Mark Dixon.pdf(226.56 KB) SDP00000191_Exhibit MRD_10 - Photographs.pdf(1.96 MB) SDP00000192_Exhibit MRD_2 - Original Quotation.pdf(274.54 KB) SDP00000193_Exhibit MRD_8 - Sequence of Works.pdf(675.92 KB) SDP00000194_Exhibit MRD_11 - Quality Assessment Sheet.pdf(33.87 KB) SDP00000195_Exhibit MRD_1 - Draft Police Statement.pdf(5.2 MB) SDP00000197_Exhibit MRD_4 - Email from Adam Marriott to Mark Dixon.pdf(223.47 KB) SDP00000198_Exhibit MRD_7 - Risk Assessment and Method Statement.pdf(4.25 MB) SDP00000200_Exhibit MRD_5 - Email exchange between Mark Dixon and Simon O’Connor.pdf(239.64 KB) SDP00000201_Index to the witness statement of Mark Reginald Dixon.pdf(19.63 KB) SDP00000202_Exhibit MRD_12 - Email from Mark Dixon to Daniel Osgood, Simon O’Connor and Lynda Prentice.pdf(255.9 KB) SDP00000203_Exhibit MRD_3 - Email from Adam Marriott to Mark Dixon.pdf(290.69 KB) MET00056694_MET Witness Statement of Mark Reginald Frank Dixon (SD Plastering Ltd) re evidence provided to MET.pdf(482.22 KB) MET00056696_MET Witness Statement of Mark Reginald Frank Dixon (SD Plastering Ltd) re evidence provided to MET.pdf(445.2 KB) RYD00031801_Email from Adam Marriott to SD Plastering, Mark Dixon regarding letter of intent for the Drylining Package required at Grenfell Tower.pdf(392.1 KB) RYD00031806_Rydon Document entitled _Rydon Maintenance Limited Appendix B Standard Terms & Conditions_ Part of Rydon's generic documentation attached_included in Subcontractor Letter of Intent.pdf(169.59 KB) RYD00032519_Email between Rydon re Grenfell Tower Internal Window Trimming and Boxing Club works.®.pdf(803.59 KB) RYD00035207_Rydon Site Progress Report for Grenfell Tower.pdf(440.49 KB) RYD00037749_Correspondence between Rydon and Everglaze regarding price for window surrounds at Grenfell Tower - including suggestion by Simon Lawrence (Rydon Contracts Mgr) to _simplify the su.pdf(1.8 MB) RYD00040428_Correspondence between SDPlastering and Rydon regarding date for contractor to install widow surround in show flat at Grenfell Tower.pdf(590.82 KB) RYD00042593_Excel spreadsheet by SDPlastering setting out stages of window trim install - sequence for window surrounds.pdf(640.5 KB) RYD00042886_Correspondence between SDPlastering and Rydon regarding impact of no. of windows on each floor of Grenfell Tower on budgets and materials.pdf(477.75 KB) RYD00044167_E-mail between Rydon and SD Plastering re Internal Window Trimming Sign Offs Concerns.pdf(766 KB) RYD00044331_Email between Rydon and SD Plastering re Grenfell Tower Window Trimming and Curtains Take off and decorating.pdf(1.27 MB) RYD00055835_Email chain between Chris Holt and Andy Cole (SD Plastering) concerning complaint from flat 53 regarding plastering work around windows..pdf(981.74 KB) RYD00055860_E-mail chain regarding poor standard of work on window trims in flat 53.pdf(1.87 MB) RYD00064707_Correspondence between SD Plastering and Rydon regarding fire stopping and other works to be carried out at Grenfell Tower.pdf(767.51 KB) RYD00085892_E-mail schedule of outstanding window defects.pdf(715.75 KB) SDP00000137_Email from Mark Dixon to Adam Marriott attaching Window Surround Front Sheet.pdf(785.72 KB)