Date: 17 November 2020 > View this hearingWitness: Paul Evans> View other evidenceType: Document> View more Document evidence
Downloads Download all files as a zip CEL00010058_Signed Witness Statement of Paul Kevin Evans (Celotex).pdf(857.14 KB) CEL00012233_2020.06.15 Witness Statement of Paul Kevin Evans.pdf(576.1 KB) IDX0043_Paul Evans No. 1 (Celotex).pdf(67.36 KB) CEL00000409_Celotex RS5000 data sheet_0.pdf(1.21 MB) CEL00000411_Celotex RS5000 datasheet_0.pdf(1.11 MB) CEL00000415_Celotex guide_ 'Rainscreen Cladding Compliance Guide' on compliance with Aproved Document B2.pdf(1.55 MB) CEL00000417_Rainscreen cladding specification guide RS5000.pdf(5.9 MB) CEL00000463_Email internal Celotex regarding pricing, lead time and minimum order for Grenfell Tower_0.pdf(2.48 MB) CEL00000464_Celotex email re green funding.pdf(940.7 KB) CEL00000543_Email from BRE to Celotex providing a provisional update on BS476 part 6 test results.pdf(1.38 MB) CEL00000673_Email chain between International Fire Consultants group and Celotex regarding 'FR5000' testing viability.pdf(1.2 MB) CEL00000675_Celotex email - forwarding email chain between International Fire Consultants group and Celotex regarding 'FR5000' testing viability.pdf(1.25 MB) CEL00000718_Celotex email re fire testing.pdf(51.3 KB) CEL00000836_Internal Celotex meeting reminder re_ BS 8414 fire test in Watford on 14_02_2014..pdf(13.19 KB) CEL00000858_Celotex email re cost of retesting to BR 135.pdf(678.8 KB) CEL00000932_Internal Celotex email attaching MAG Presentation.pdf(13.09 KB) CEL00000961_Celotex presentation entitled _Above 18m” - version 2 regarding Approved Document B (fire safety) and BS8414 testing.pdf(1.66 MB) CEL00000974_Email Between Simco and Jon Roper of Celotex dated 21.01.14 - 01.07.14 regarding fire testing.pdf(1.46 MB) CEL00001022_Email chain (3 - 22 September) between Celotex and NHBC regarding use of RS5000 on 18m+ projects.pdf(6.83 MB) CEL00001030_NHBC update on position re RS5000.pdf(2.35 MB) CEL00001036_Celotex email re CWCT AGM attaching presentation_0.pdf(1.29 MB) CEL00001043_Celotex email to NHBC_ follow up after meeting RS5000 and full-fill insulation.pdf(976.38 KB) CEL00001047_NHBC and Celotex email_ follow up after meeting regarding 18m+ and full fill insulation.pdf(1.75 MB) CEL00001079_Correspondence between Ardmore Construction and Celotex - Octavius Street RS5000 Insulation.pdf(3.92 MB) CEL00001087_Celotex email re NHBC position on above 18m.pdf(260.41 KB) CEL00001088_NHBC letter with guidance on compliance with fire safety standards.pdf(1.03 MB) CEL00001099_Email correspondence between Exova and Celotex, followed by internal Celotex email re_ draft Exova desktop report for RS5000..pdf(1.71 MB) CEL00001100_Draft Exova desktop report entitled _The Fire Performance of Celotex - PIR Facade Cladding Systems when testing following BS 8414 Part 2_2005_, prepared for Celotex (WF No. 351551).pdf(4.44 MB) CEL00001110_NHBC email to Celotex confirming receipt of reports.pdf(1.2 MB) CEL00001122_Internal Celotex email following exchanges with the NHBC regarding Celotex’s RS5000 test report.pdf(3.36 MB) CEL00001124_Email correspondence between Celotex and NHBC regarding test report for RS5000 and feedback received from Exova..pdf(3.97 MB) CEL00001125_Response from Celotex to NHBC email re RS5000 reports, including further feedback from Exova.pdf(632.97 KB) CEL00001127_Celotex internal email (Debbie Berger to Paul Evans) attaching Exova draft desktop report.pdf(704.14 KB) CEL00001128_Exova Warringtonfire report on the fire performance of Celotex PIR Facade Cladding Systems when tested following BS 8414 Part 2_2005. Report No_ WF No.351551.pdf(5.52 MB) CEL00001194_Internal Celotex email attaching summary of meeting with Sotech.pdf(208.24 KB) CEL00001195_Minutes of meeting IFC, Sotech and Celotex regarding fire testing.pdf(20.8 KB) CEL00001196_Celotex presentation on above 18m testing programme.pdf(2.24 MB) CEL00001214_Marketing Action Plan.pdf(1.77 MB) CEL00001273_Celotex email re RS5000 Short and Long term strategy.pdf(929.69 KB) CEL00001344_Celotex internal email - invoice requisitions for testing.pdf(1.79 MB) CEL00001350_Celotex email re test report.pdf(1.04 MB) CEL00001413_BCA Technical Guidance Note 18 on the Use of Combustible Cladding Materials on Residential Buildings..pdf(910.73 KB) CEL00001851_Internal Celotex email regarding testing.pdf(1 MB) CEL00001863_Notes of meeting with Sotech re BR135 testing.pdf(868.94 KB) CEL00001865_Internal Celotex email regarding the Sotech Contact Report.pdf(306.92 KB) CEL00002241_Email exchange between Celotex and the NHBC regarding the full test report for RS 5000 and discussion re draft desktop study report produced by Exova..pdf(3.6 MB) CEL00002517_Photo of board dealing with NHBC concerns, _CX_ response, actions required and risk.pdf(325.53 KB) CEL00002544_Handwritten notes regarding BS8414, BRE and fire spread.pdf(770.64 KB) CEL00002878_Internal Celotex emails regarding rainscreen applications, buildings over 18m and potential testing for the use of FR5000 in cladding applications.pdf(791.33 KB) CEL00002894_Celotex PDI Action List mentioning above 18m fire test.pdf(284.01 KB)