Date: 28 October 2020 > View this hearingWitness: Dr Barbara Lane> View other evidenceType: Document> View more Document evidence
Downloads Download all files as a zip EXO00000164_Exova Fee Proposal - Fire Safety Engineering Services.pdf(8.53 MB) EXO00000182_Email chain re Exova's request for the FRA on GT.pdf(1.12 MB) EXO00000184_T Pearson to T Ashton (Exova) Email re Issue 2 OFSS amendments re shared staircase.pdf(771.04 KB) EXO00000192_C Barker to C Cooney (Exova) email re Deadline for planning and fire strategy.pdf(1.44 MB) EXO00000193_C Barker to C Cooney (Exova) email re planning and fire safety deadline.pdf(543.5 KB) EXO00000194_P Dunkerton (TMO) to C Cooney (Exova) CC J Wray (TMO) email re current FRA request_0.pdf(1.06 MB) EXO00000197_Emails between Colin Chiles (Leadbitter), Neil Crawford, Ben Rogerson, Terry Ashton and Tony Pearson (Exova) re fire service access to Grenfell Tower_0.pdf(798.14 KB) EXO00000206_N Crawford (Studio E) to T Ashton (Exova) cc S O'Connor (Ryd), B Sounes (S E)_0.pdf(2.28 MB) EXO00000220_Email from P Dunkerton (TMO) to B Sounes (Studio E) and T Ashton (Exova) forwarding email from Janice Wray (TMO H&S Manager) re fire at Grenfell Tower on 30.04.10_0.pdf(1.11 MB) EXO00000241_Emails between Claire Williams (TMO), Bruce Sounes (Studio E), Tom Ashton (Curtins), Terry Ashton (Exova) and Max Fordham re GT external stair configuration.pdf(878.54 KB) EXO00000250_Email from Studio E to Max Fordham discussing fire strategy & smoke ventilation..pdf(295.63 KB) EXO00000259_Email from Studio E to Exova attaching draft fire strategy, suggesting to reduce cross sectional area of smoke extract..pdf(334.14 KB) EXO00000278_Email from Studio E to Curtins, Max Fordham, Exova re proposed office layout.pdf(534.14 KB) EXO00000297_Studio E, drawing entitled Proposed Mezzanine Floor Plans, 1279 RE112 Rev 04.pdf(446.34 KB) EXO00000299_Studio E, drawing entitled Proposed Walkway +1 Floor Plan, 1279 RE 114 Rev 03.pdf(466.75 KB) EXO00000302_Exova Invoice for £679.80..pdf(366.22 KB) EXO00000343_M Smith to C Barker (Exova) cc McQuatt (MaxF) email re Smoke Extract design specification.pdf(241.95 KB) EXO00000378_B Sounes emmail to C Barker cc T Ashton and Studio E re Attending meeting and AOV comments_1.pdf(460.54 KB) EXO00000388_Email from Cate Cooney to Terry Ashton (Exova) re proposed fire strategy for Grenfell Tower_1.pdf(694.22 KB) EXO00000390_Email from Exova to Studio E attaching Grenfell ventilation drawings._0.pdf(347.26 KB) EXO00000394_Email from Exova to Studio E attaching outline Grenfell fire strategy..pdf(280.18 KB) EXO00000427_Email Studio E to RBKC cc Exova, Max Fordham re building control fire strategy_0.pdf(422.69 KB) EXO00000430_Exova Grenfell Tower Outline Fire Safety Strategy dated 24_10_2012 Attached to Studio E Fire Strategy sent to building control_1.pdf(4.12 MB) EXO00000435_TMO document entitled _Notes From Meeting 8_ regarding Studio E Notes from Project Meeting held on Thursday 06 September 2012 at 14h00, attended by representatives from RBKC, Lead.pdf(1.76 MB) EXO00000441_Studio E Notes from Project Meeting held on Thursday 26 July 2012 at 14h00.pdf(1.77 MB) EXO00000454_Email from Neil Crawford (Studio E) to Terry Ashton (Exova) cc Rydon re revised fire strategy plans.pdf(635.71 KB) EXO00000519_Exova Grenfell Tower Outline Fire Safety Strategy dated 31_10_2011_1.pdf(3.81 MB) EXO00000543_Email from Alun Dawson (Appleyards) to Terry Ashton (Exova) re Exova fee approval proposal re Grenfell Tower_0.pdf(803.48 KB) EXO00000582_An Exova Warringtonfire report on the Grenfell Tower refurbishment. The report details the statutory controls on fire safety as well as a strategy on compliance with the statutory.pdf(4.3 MB) EXO00000586_Email chain between Exova and Studio E re cavity barriers fire resistance_1.pdf(1.65 MB) EXO00000601_Emails between Adrian Jess (Studio E) to Terry Ashton (Exova) re fire strategy_comments on revised mezzanine and walkway level plans for Grenfell_0.pdf(1.73 MB) EXO00000633_Email chain between Exova and TMO re advice on changes to floor layout.pdf(843.83 KB) EXO00000634_Emails between Claire Williams (TMO), Terry Ashton (Exova) cc Artelia re changes to floor layout at Grenfell Tower and need for AOV within boxing club lobby.pdf(1.67 MB) EXO00000639_T Ashton to B Sounes cc P Dunkerton, M Treanor email re fee proposals.pdf(640.53 KB) EXO00000655_Internal Exova email discussing modifying fire strategy in light of adding residential floors, described as 'making a crap situation worse' (Exova mention single stair and no sprin_0.pdf(714.92 KB) EXO00000659_M Smith to T Ashton cc B Sounes, D Campbell, Studio E email re AOV and design of fire strategy.pdf(1.95 MB) EXO00000662_Emails between B Sounes (Studio E), T Ashton (Exova), M Smith, D Campbell (Max Fordham) re stair configuration, boxing and office layouts and smoke control system.pdf(1.79 MB) EXO00000668_Internal Exova email discussing staff absence and unapproved fees delaying fire strategy...pdf(1.83 MB) EXO00000673_Emails between Exova and Studio E regarding fire consultancy fee proposal, initial comments on feasibility of design proposals and need for site visit, attaching site photos.pdf(2.52 MB) EXO00000688_Emails between A Bridge (RJ Electrics), T Ashton, T Pearson (Exova) cc A Whyte, J Earl (JSW), S Blake, D Hughes (Rydon) and M Smith (Max F) re amendments to GT plans since last fir_0.pdf(764.52 KB) EXO00000708_Email Exova to Studio E re insulation and cavity fire barriers_1.pdf(1.14 MB) EXO00000709_N Crawford to T Ashton email re cladding drawings from Harley and cavity barriers.pdf(1 MB) EXO00000714_Email between Exova and Studio E re insulation and cavity barriers_0.pdf(1.78 MB) EXO00000715_T Ashton to N Crawford email re Fire Stopping Fire Strategy cavity barrier_1.pdf(2.34 MB) EXO00000716_Email between Studio E, Exova and Artelia re Grenfell Tower Fire Strategy.pdf(1.46 MB) EXO00000720_Email chain between Studio E and Exova (cc Rydon) re commnets on building control submission.pdf(2.69 MB) EXO00000721_Email from RBKC buiiding control to Studio E saying RBKC have insufficient info from fire strategy to consult with LFB. RBKC need to prove the new smoke extract system is as good a_0.pdf(1.17 MB) EXO00000739_Email between Studio E and Exova re Grenfell Tower Refurbishment Design Stages.pdf(1.27 MB) EXO00000747_Emails between Colin Chiles (Leadbitter), Andrzej Kuszell, Ben Rogerson (Exova) and Neil Crawford (Studio E) re fire strategy for Grenfell, particularly fire service access.pdf(850.15 KB) EXO00000784_Existing Fire Safety Strategy Grenfell Tower Regeneration Project, London (DRAFT).pdf(8.48 MB)