Date: 28 October 2020 > View this hearingWitness: Dr Barbara Lane> View other evidenceType: Document> View more Document evidence
Downloads Download all files as a zip SEA00005129_Email Chain attaching tender docs, smoke extract info, specifications, document register_0.pdf(702.25 KB) SEA00005651_Email re 2012 fire strategy including stair pressure_ventilation, risers, fire lift, fire doors_0.pdf(1.08 MB) SEA00005848_Email attaching draft fire strategy_0.pdf(718.97 KB) SEA00006015_Document Extract entitled Grenfell Tower Design and Access Statement D+A regarding the site, the use, the landscape and sustainability in relation to Grenfell Tower refurbishment w_0.pdf(13.43 MB) SEA00006351_Email chain entitled_ Scope of works for upgrading the smoke extract system at Grenfell Towers_0.pdf(1.14 MB) SEA00006394_Email from Studio E to Max Fordham, Exova and Curtins Consulting regarding Grenfel Tower Work Packages spreadsheet and a discussion of design and work packages_0.pdf(408.11 KB) SEA00006429_Studio E, Grenfell Tower Regeneration Project Stage C Report regarding the architectural aspects of the Grenfell Tower regeneration project embedding drawings of the building, floo_1.pdf(66.7 MB) SEA00006443_Email attaching draft fire strategy_0.pdf(215.75 KB) SEA00006448_Studio E Notes from Project Meeting No. 9 involving RBKC TMO, Leadbitter, Appleyards, Curtins Consulting, Max Fordham, Churchman Landscape Architects (CLA), Syntegra, Exova, Jane S_0.pdf(2.18 MB) SEA00006505_Email re meeting with building control, comments on smoke extraction system, risers, vents_0.pdf(525.04 KB) SEA00006526_Email from Adrian Jess at Studio E to Max Fordham, Appleyards and Leadbitter noting meeting with RBKC building control re fire strategy_0.pdf(1.86 MB) SEA00008052_Email from Sounes to Booth, Maddison, Gibson, Kulidzan, Campbell, Smith, Strazzullo, Ashton, Lim attaching Stage D report including fire safety report, BREEAM assessment and cost e.pdf(441.98 KB) SEA00008054_Studio E Document Entitled _Grenfell Tower Regeneration Project Stage D Report August 2013_, embedding drawings of Walking Routes, Lancaster West, Design Approach Podium, Proposed_1.pdf(40.31 MB) SEA00008373_FW_ Building control for Grenfell tower project_0.pdf(984.01 KB) SEA00008394_FW_ Grenfell Tower - additional consultants._0.pdf(286.17 KB) SEA00008686_Email Chain Between Smith, Sounes, Ashton, Campbell, Strazzullo, Studio E regarding site visit, exit route for the boxing club, smoke vent serving lift lobby_0.pdf(686.64 KB) SEA00008833_Email Chain Between Sounes, Ashton, Smith, Campbell, Studio E regarding stair configuration, AOV, acoustics_0.pdf(421.74 KB) SEA00008862_Email Chain Between Sounes, Ashton, Smith, Campbell, Studio E regarding stair configuration, AOV, acoustics, secondary exit from boxing club_0.pdf(1.31 MB) SEA00008951_Email Chain Between Sounes, Ashton, Smith, Campbell, Studio E regarding stair configuration, AOV, acoustics, secondary exit from boxing club_0.pdf(1.78 MB) SEA00008957_Email Chain Between Sounes, Ashton, Smith, Campbell, Studio E regarding stair configuration, AOV, acoustics, secondary exit from boxing club_0.pdf(1.9 MB) SEA00009033_Email from Sounes to Ashton, Studio E, Smith, Campbell attaching draft fire strategy and fire access drawing, comment on reduction in AOV size_0.pdf(205.4 KB) SEA00009242_Email Chain Between Sounes, Ashton, Strazzullo, Smith, Campbell, Ashton, Studio E, Marshall attaching plan for offices, retention of existing escape stair, exit route via lobby_0.pdf(536.47 KB) SEA00009814_Email Chain Between Sounes, Allen, Hanson, Ashton, Campbell regarding fire strategy, building regulations, smoke extract system_0.pdf(2.35 MB) SEA00009820_RE_ Grenfell Tower Studio E contract_0.pdf(1.94 MB) SEA00010232_Email Chain Between Sounes, Allen, Hanson, Ashton, Campbell, Hoban regarding fire strategy, building regulations, smoke extract system, fire curtain, fire escape route, embedding a_0.pdf(2.8 MB) SEA00010474_1279 SEA (04) 105 - Proposed Residental Plan (W+2)_0.pdf(256.74 KB) SEA00010498_Studio E Notebook Extract_0.pdf(60.62 KB) SEA00010953_Correspondence between KCTMO, Artelia, Rydon, IBI Group, Studio E regaridng minutes from planner meeting 08_05_14 and comments on service life of zinc and ACM_0.pdf(1.34 MB) SEA00011395_RE_ Grenfell Tower - Building Control Fees_1.pdf(460.38 KB) SEA00011705_Correspondence between Rydon, Studio E, Exova and Harley regarding fire breaks_cavity barriers within the cladding areas at Grenfell Tower_0.pdf(421.96 KB) SEA00011724_Correspondence between Rydon, Studio E, Exova and Harley regarding fire breaks_cavity barriers within the cladding areas at Grenfell Tower_1.pdf(1.07 MB) SEA00012158__RBKC MOE Plan Grenfell Tower, Grenfell Road Ground floor 1279 SEA (08) 100b - Fire Access-A1-000 S1.pdf_.pdf(1.8 MB) SEA00012159_RBKC MOE Plan Grenfell Tower 1279 SEA (08) 101b - Fire Strategy-A1-000 S1.pdf(1.1 MB) SEA00012200_Email Chain Between Crawford, Hoban, Lawrence, Hanson, Ashton, O'Connor, Sounes regarding fire strategy drawings for lower levels, Exova strategy, extraction, riser access_2.pdf(2.88 MB) SEA00013034_Correspondence between Harley, Studio E and Rydon regarding cavity fire barriers and fire stops in relation to Grenfell Tower_0.pdf(664.74 KB) SEA00013049_Correspondence between Harley, Studio E, Rydon and Exova regarding fire barriers, contrast between cavity barriers and firestops in relation to Grenfell Tower and potent_1.pdf(2.31 MB) SEA00014180_Email requesting info on riser cupboard door detail._0.pdf(402.82 KB) SEA00014274_Exhibit BS_1 - Bruce Sounes (Studio E)_2.pdf(105.64 MB) SIG00000010_Harley Curtain Wall purchase order from SIG relating to Celotex RS5080, annotated.pdf(244.8 KB) SIG00000012_Harley Curtain Wall purchase order to SIG for the purchase of Kingspan K15 Insulation board._0.pdf(2.29 MB) TMO00829152_Progress Meeting Minutes 15 July 14.pdf(458.83 KB) TMO00830598_TMO Document entitled _TMO Fire Safety Policy_ dated Sept 2013.pdf(13.11 MB) TMO00831859_TMO Document Entitled _Regulatory Reform (Fire Safety) Order 2005) Fire Risk Assessment for Grenfell Tower by Carl Stokes) dated 20.11.12.pdf(1.33 MB) TMO00832490_Artelia- Pre-Start Meeting Minutes_1.pdf(2.43 MB) TMO00834217_Grenfell Tower Boxing Club User Manual..pdf(2.51 MB) TMO00834924_Studio E GT Regeneration Project Stage D Report with embedded drawings.pdf(26.35 MB) TMO00835555_Exhibit CS_9 - Studio E drawing entitled Existing Floor Plans, 1279 PL010 Rev 00.pdf(372.8 KB) TMO00853783_Email from TMO to RBKC re lift renewal.pdf(9.67 MB) TMO00866662_Email chain internal TMO discussion regarding the upcoming fire door replacement programme and the high priority blocks in the stocks..pdf(2.18 MB) TMO00866665_TMO Spreadsheet entitled _Fire Door Data Entry_. Rand Associates Survey of doors, and survey from the TMO.xls(401 KB)